


GUELB I
- Industry:
- Industrial Plants
- Country:
- Mauritania
Industry Mining & metallurgy
Between 1999 and 2000 Ferrostaal realized a grinding plant for iron ore and material handling in Zouerate, Mauritania. The plant has a handling capacity of 3,500 tonnes per hour. We reailized the project on a turn-key basis, including the engineering, equipment delivery and supervision of construction. Additionally Ferrostaal was responsible for the commissioning and training of the local staff.
Overview | |
---|---|
Type of contract | Lump-Sum-Turnkey |
Customer | SNIM (Société Nationale d´Industrie et Miniére |
Project | Iron ore grinding plant |
Plant capacity | 3.500 t.p.h. |
Plant site | Zouerate, Mauritania |
Plant units | roller presses, belt conveyor system, stock house |
Turn-key handover | 2000 |